V25.26

Scenario
Ryanfire SL Collar & Mastic to Ø50mm MDPE pipe through 120mm concrete floor
Fire Integrity
90 minutes
Insulation
90 minutes
Scenario
Ryanfire SL Collar & Mastic to Ø25mm MDPE pipe through 120mm concrete floor
Fire Integrity
120 minutes
Insulation
120 minutes
Scenario
Ryanfire SL Collar & Mastic to Ø20mm MDPE pipe through 120mm concrete floor
Fire Integrity
120 minutes
Insulation
120 minutes
V25.26
Brochure / Datasheet
Download
V25.26